IBM C1000-132 exam covers a wide range of topics related to IBM Maximo Manage v8.0, including installation and configuration, database management, security, reporting, and integration with other systems. C1000-132 exam consists of 64 multiple-choice questions, and candidates need to score at least 64% to pass the exam. C1000-132 exam duration is 90 minutes, and it can be taken at any authorized testing center.

 

NEW QUESTION # 36
In the Work Order Tracking application, when using the Select Value on the Safety Plans field from where can the safety plan be derived?

  • A. Safety Plans where the Location or Asset on the Work Order is referenced as a Work Asset on the Safety Plan.
  • B. It always shows Active Safety Plans that are in the same site as the work order.
  • C. Safety Plans that are referenced in the Location Hierarchy.
  • D. The Safety Plan that is associated with the Preventive Maintenance record.

Answer: A


NEW QUESTION # 37
What are the three default values used with the position of a Crew Type or Crew?

  • A. Technician
  • B. Driver
  • C. Apprentice
  • D. Supervisor
  • E. Leader
  • F. Helper

Answer: C,E,F

Explanation:
In IBM Maximo Manage v8.0 implementation, the three default values used with the position of a Crew Type or Crew are Helper, Leader, and Apprentice. These values represent the different roles that members of a crew can assume.


NEW QUESTION # 38
In the Master PM application, which two meter-based fields can be updated on associated Preventive Maintenance records? (Choose two.)

  • A. Current Meter Reading
  • B. Meter Type
  • C. Frequency
  • D. Estimation Type
  • E. Generate WO Ahead By

Answer: C,E

Explanation:
In the IBM Maximo Master PM application, certain meter-based fields can be updated on associated Preventive Maintenance (PM) records when changes are made to the Master PM. Specifically:
* Generate WO Ahead By: This field sets a lead time for generating work orders ahead of their scheduled due date based on meter readings. Updating this field on the Master PM will adjust when work orders are generated on associated PMs
* Frequency: The frequency determines how often maintenance should occur based on meter readings.
When the frequency is updated on the Master PM, this adjustment is applied to associated PMs, ensuring they reflect the updated maintenance interval These updates allow for consistent and centralized management of preventive maintenance intervals and scheduling, essential for meter-based maintenance tracking in Maximo. Other fields like "Current Meter Reading" or "Meter Type" are not directly updated on associated PMs through the Master PM.


NEW QUESTION # 39
Which Maximo application can be used to generate replacement plans for assets?

  • A. Maximo Health
  • B. Maximo Manage
  • C. Maximo Health, Safety and Environmental (HSE)
  • D. Maximo Predict

Answer: A

Explanation:
The Maximo Health application can be used to generate replacement plans for assets.


NEW QUESTION # 40
What are three statuses used in the Service Requests application? (Choose three.)

  • A. QUEUED
  • B. PENDING
  • C. RESOLVED
  • D. APPROVED
  • E. ENTERED
  • F. COMPLETED

Answer: A,B,C


NEW QUESTION # 41
How can a user be granted access to a Work Center application?

  • A. by using self-registration
  • B. using the Security Groups application
  • C. using the Maximo Management Interface
  • D. using the Administration Work Center

Answer: B


NEW QUESTION # 42
When users are added to multiple security groups, the authorization privileges of the security groups combine, with the exception of security groups with which setting?

  • A. Independent
  • B. Separate
  • C. Discreet
  • D. Autonomous

Answer: A

Explanation:
When users are added to multiple security groups, the authorization privileges of the security groups combine, with the exception of security groups with the "Independent" setting. When a security group has the "Independent" setting, its authorization privileges are applied separately from any other security group that the user belongs to.


NEW QUESTION # 43
Which two events can be triggered from a Condition Monitoring Point? (Choose two.)

  • A. Creation of a Work Order with a Job Plan applied.
  • B. Creation of a Service Request.
  • C. Triggering of a Preventive Maintenance record.
  • D. Creation of an Unscheduled Inspection.
  • E. Triggering a meter rolldown.

Answer: A,C


NEW QUESTION # 44
In the Item Master application, with what can a Kit Item be associated?

  • A. Service item
  • B. Condition enabled item
  • C. Non Rotating item
  • D. Lot item

Answer: C

Explanation:
a Kit Item can be associated with A. Non Rotating item. When you create a kit record for an item in the Item Master application, you can define the structure of the kit using the Item Assembly Structure tab1. When adding a kit to a storeroom, if the component items do not exist in the storeroom, inventory records are created for these items1. However, you cannot create item kits that contain condition-enabled, rotating or lotted items1.


NEW QUESTION # 45
When users are added to multiple security groups, the authorization privileges of the security groups combine, with the exception of security groups with which setting?

  • A. Independent
  • B. Separate
  • C. Discreet
  • D. Autonomous

Answer: A

Explanation:
When users are added to multiple security groups, the authorization privileges of the security groups combine, with the exception of security groups with the "Independent" setting. When a security group has the
"Independent" setting, its authorization privileges are applied separately from any other security group that the user belongs to.


NEW QUESTION # 46
Where can Default Values be specified for Service Requests created using the Service Request Work Center?

  • A. Application Designer
  • B. Administration Work Center
  • C. Service Desk Application
  • D. in the users Profile

Answer: B


NEW QUESTION # 47
What are three available associations in the Hazards application?

  • A. Material Safety Data Sheets (MSDS)
  • B. Safety Plans
  • C. Lock Outs
  • D. Tag Outs
  • E. Precautions
  • F. Hazardous Materials

Answer: D,E,F

Explanation:
The Hazards application in IBM Maximo Manage v8.0 allows users to associate Material Safety Data Sheets (MSDS), Hazardous Materials, and Precautions with a particular hazard. These associations help in managing safety information related to hazards and in ensuring compliance with safety regulations.


NEW QUESTION # 48
In which Maximo add-on can the Build Data Interpreter (BDI) be found?

  • A. Maximo Buildinq Information Modelinq
  • B. Maximo Asset Confiquration Manaqer (ACM)
  • C. Maximo Infrastructure and Buildinq Modeler
  • D. Maximo Health, Safety and Environment

Answer: B


NEW QUESTION # 49
Which statement is true regarding Work Assets in the Safety Plans application?

  • A. A Work Asset is either an Asset, Asset Type, or a Location. A user does not need to specify Work Assets, as a Safety Plan can be applied without it.
  • B. A Work Asset is either a Location or an Asset. A user needs to specify at least one of these for each record.
  • C. A Work Asset is either a Location or an Asset. A user does not need to specify Work Assets, as a Safety Plan can be applied without it.
  • D. A Work Asset is either a Rotating Item, a Location, or an Asset. A user needs to specify at least one of these for each record.

Answer: B

Explanation:
In the Safety Plans application, a Work Asset is either a location or an asset that requires the safety plan. Each safety plan record must have at least one work asset specified, and the work asset can be a location or an asset.


NEW QUESTION # 50
In which three applications can Asset Depreciation be configured?

  • A. Chart of Accounts
  • B. Assets
  • C. Item Master
  • D. Asset Templates
  • E. Tools
  • F. Locations

Answer: B,D,F

Explanation:
Asset Depreciation can be configured in three applications in IBM Maximo Manage v8.0 according to IBM's documentation. These applications are:
Asset Templates
Assets
Locations


NEW QUESTION # 51
......